Zhibit.bizSmall business owner? Start your free website
Registration takes seconds • No credit card required
Help | Register | Login
 
Account
 Login
 Register
About
 Overview
 Features
 Pricing
 Company
 Step-by-step tour
 ORG vs BIZ
 Testimonials
Business directory
 Categories
 North America
 International
 Search
Community
 Blogs
 New items
Help
 FAQ
 Contact us
Resources
 Safety tips
 Links

Brian R Lindsay

Business directory :: Brian R Lindsay

T.E.S.C. POND ANALYSIS: SURFACE AREA POND CALCULATIONS PER DOE BASIN “A”: SA = Surface Area = (1.2) (Q for 10YR, Average between existing and developed)/(Velocity of Settling) SA = (1.2) ((2.10+3.73)/2 cfs)/ (0.00096 fps) SA = 3,644 SF (Pond settling surface Required) SA = >4,000 SF (Pond settling surface Provided) BASIN “B”: SA = Surface Area = (1.2)(Q for 10YR, Average between existing and developed)/(Velocity of Settling) SA = (1.2) ((2.15+3.52)/2 cfs)/ (0.00096 fps) SA = 3,544 SF... T.E.S.C.Pond

Products

 

Contact

zhibit.biz/brianlindsayservices
Sign guestbook | Send message 



Stanwood, WA 98292
United States

About

Brian R Lindsay 
Brian R Lindsay 360-652-1075 BrianRLindsay@gmail.com To Whom It May Concern, In the past 30 years I have worked for 2 private surveying and engineering companies representing public and private clients. I have designed and engineered projects that included construction management and acquisition of the permits. Projects included plats, schools, churches, high-rises, wear houses, airports and even lakes. I have mastered hydrology. I believe my interest, experience and education support my ability to learn and produce in this area. I am confident that I can offer positive contributions to any team while being open to the personal growth that the experience will undoubtedly provide. I would be thrilled for the opportunity to contribute to the growth of your company and community. I have acquired many talents as a Hydrologist of Civil Site Design from planning to construction management. I provide concise calculations, write reports, documents and specifications. I have extensive experience that is relevant...

Blog

ONSITE SEWER SYSTEM DESIGN DWG
ONSITE SEWER SYSTEM DESIGN DWG The County Health Department expects drawings that they can easily read and the only way that can be accomplished is by hand drafting. Yes Auto Cad drawings just can’t provide that without over kill and costing 3 or 4 times as much.
Sediment Pond
T.E.S.C. POND ANALYSIS: SURFACE AREA POND CALCULATIONS PER DOE BASIN “A”: SA = Surface Area = (1.2) (Q for 10YR, Average between existing and developed)/(Velocity of Settling) SA = (1.2) ((2.10+3.73)/2 cfs)/ (0.00096 fps) SA = 3,644 SF (Pond settling surface Required) SA = > 4,000 SF (Pond settling surface Provided) BASIN “B”: SA = Surface Area = (1.2)(Q for 10YR, Average between existing and developed)/(Velocity of Settling) SA = (1.2) ((2.15+3.52)/2 cfs)/ (0.00096 fps) SA = 3,544 SF (P
Land Development
I feel that when the local jurisdictions stand with the landowner and utilize the value of habitable growth of the land to include our future generations this economy will stabilize. So it is the government that is governed by the people that need to catch up. The landowner needs to make contact with the Civil Engineer to move forward with development.
Engineering Services
I provide full Engineering Design and Coordination Services for all Land Development needs for the State of Washington. Brian R Lindsay
 
Copyright © 2012, Zhibit LLC
Terms of use | Privacy policy